Schedule digital signage by choosing what plays, which screens show it, when it appears and how it shares the screen. Review those four decisions together before publishing, then compare the planned times with the record of what played. Worked numbers help you judge how much airtime a repeating item will occupy.
What are the four decisions in a signage schedule?
Start with the message and the people who need to see it. A reception welcome board may run throughout opening hours, while a class reminder belongs near the start of that class. Its purpose gives you a way to judge both the timing and the length of each play.
Next, name the screens that need the content and the time window in which it belongs. A window is the period when an item is allowed to play, such as the hours between opening and closing. Choose the days too, including differences between weekday and weekend service.
The fourth decision is how the item sits with everything else on the screen. It might provide the main content, appear over that content or take over the whole screen for a while. Decide this before counting plays, because a promotion can share time without occupying the entire display.
How often does a promotion every 20 minutes play?
A repeating schedule needs a starting time, an ending time, an interval between starts and a duration for each play. In Mwenje, you can describe those choices in a sentence and review the proposed schedule before it airs. This example gives a weekday promotion five minutes on screen every twenty minutes.
Every 20 minutes for 5 minutes from 8am to 8pm on weekdays.
The window from 8am to 8pm is twelve hours, or 12 × 60 = 720 minutes. Dividing 720 by the twenty-minute interval gives 36 plays on each weekday.
Each play lasts five minutes, so the daily total is 36 × 5 = 180 minutes, or three hours. Those 180 minutes occupy one quarter of the 720-minute window. The first starts are 8:00, 8:20 and 8:40, and the last play starts at 7:40pm and ends at 7:45pm.
The repeat interval measures the gap between starting times, rather than a pause after each play ends. A five-minute item starting at 8:00 ends at 8:05, leaving fifteen minutes until the next start at 8:20. That leaves the rest of each interval available for the regular content on the board.
- Five-minute play
- Time between plays
| Play | Starts | Ends | Minutes |
|---|---|---|---|
| First | 08:00 | 08:05 | 5 |
| Second | 08:20 | 08:25 | 5 |
| Third | 08:40 | 08:45 | 5 |
How do the screen layers work?
Think of layers as choices about what a visitor sees while an item is playing. Always-on content provides the main board, while an overlay is content shown on top of that board. A full takeover replaces the whole view for its allotted time before the regular content returns.
Use content shown on top when the main information should remain visible beside the addition. Space reserved for the addition prevents it from covering prices, directions or another message visitors need. Choose a full takeover when the temporary message needs the entire screen, and give it a clear ending time.
How do you plan an overnight window?
An overnight plan needs both the starting day and the ending day beside its times. An evening menu might start today and finish in the early hours of tomorrow. The next opening belongs in the same review, including any change between weekday and weekend hours.
Do not stop the preview at the point where the calendar date changes. Follow the overnight item through its ending time and confirm which content appears afterwards. The menu board dayparting guide gives a café example that continues until 1am the next morning.
What happens with screens in different time zones?
Decide whether your instruction means the same local time at each site or the same moment everywhere. A morning welcome in Auckland and a morning welcome in Perth may both belong at 7am local time. Those screens do not need to switch at the same instant to meet that instruction.
How Mwenje handles this
Alongside the sentence and proposal shown above, Mwenje offers dayparts on a 24-hour timeline and a week calendar. These let you build a schedule by hand around the same content, screens and times. The layers cover always-on content, content shown on top and full takeovers, with takeovers ending automatically so regular programming resumes.
The examples below show the plays for one eligible day, rather than the total for a week. For an all-day schedule, 24 × 60 ÷ 30 = 48 plays, with 48 × 5 = 240 minutes. That is four hours of airtime spread across the day.
The weekend example covers eight hours, so 8 × 60 ÷ 15 = 32 plays and 32 × 3 = 96 minutes. The takeover example covers sixteen hours, giving 16 × 60 ÷ 60 = 16 plays and 16 × 10 = 160 minutes. Check the chosen days alongside these totals before accepting a proposed schedule.
| Phrase | Eligible day and window | Plays per day | Airtime per day | Layer |
|---|---|---|---|---|
| Every 30 minutes for 5 minutes. | Every day, all day | 48 | 240 minutes, 4 hours | Always-on |
| Every 20 minutes for 5 minutes from 8am to 8pm on weekdays. | Each weekday, 08:00 to 20:00 | 36 | 180 minutes, 3 hours | Always-on |
| Every 15 minutes for 3 minutes from 9am to 5pm on weekends as an overlay. | Each weekend day, 09:00 to 17:00 | 32 | 96 minutes | Shown on top |
| Every hour for 10 minutes from 6am to 10pm on Mondays and Fridays as a takeover. | Each Monday and Friday, 06:00 to 22:00 | 16 | 160 minutes | Full takeover |
Mwenje handles windows that cross midnight, and each screen follows its own local time even offline. The screen wall shows what is on air right now and why, so you can inspect the current result. Analytics compare what was planned with what played, screen by screen and hour by hour.
What should you check before and after the first day?
- Confirm the intended content and the screens assigned to show it.
- Review the days, local starting time and final ending time.
- Count the repeat starts and multiply them by each play's duration.
- Preview the main board with anything that appears on top.
- Watch the end of a takeover and confirm the regular content returns.
- Watch the first overnight boundary and the following opening time.
- Compare the next day's playback record with the times you planned.
A short first schedule lets someone observe each expected change in person. Record any mismatch with the screen name, time and content that appeared, then review the relevant part of the plan. Include the offline playback test before relying on the schedule during a connection outage.